Professional, documented commissioning that ensures your lighting control system works perfectly — first time.
I deliver full, methodical commissioning of lighting control systems — including marked-up drawings, full equipment referencing, functional testing, emergency lighting mapping, and comprehensive site reports with clear defect illustrations and recommendations.
All devices fully referenced and labelled on as-built drawings.
Precise configuration of hold times, tri-level switching, and all timing parameters.
Creation and testing of all scenes, schedules and automated behaviours.
Normal retractive switches, kinetic switches, and inputs from intruder alarms, fire panels, BMS and AV systems.
Full emergency light testing, mapping of all fittings, floor-plan graphics and test reports for headend/IoT platforms.
Detailed reports with illustrated drawings showing exact defect locations and clear recommendations to resolve them.